Project description

  • —150,000 Square Feet
  • —Distribution Facility

Project scope

  • —Design & Build Project
  • —New Building Construction
  • —LED Exterior Building Mounted Sign Lighting
  • —LED Exterior Parking Lot Lighting
  • —Concrete Pole Bases
  • —LED Exterior Wall Pack Building Lighting
  • —LED Exterior Wall Mounted Building Lighting
  • —LED Exterior Wall Mounted Man Door Building Lighting
  • —LED Exterior Ground Flood Building Lighting
  • —Underground Site Utilities
  • —Concrete Utility Transformer Pad
  • —LED Interior General Office area Lighting
  • —LED Interior Warehouse Distribution area Lighting
  • —LED Interior Lighting Controls
  • —LED Building Automation and Lighting Controls
  • —LED Interior Exit Signs and Egress Lighting
  • —HVAC Equipment Hook-ups
  • —Heating and Ventilation Equipment Hook-ups
  • —Material Handling Equipment and Control Hook-ups
  • —Computer Equipment Hook-ups
  • —Main Electrical Distribution
  • —Electrical Distribution Panels
  • —Coordination & Arc Flash Study
  • —Generator and Automatic Transfer Switch
  • —Concrete Pads for Generator and Automatic Transfer Switch
  • —Fire Pump Equipment Hook-up
  • —Fire Alarm System